INFRASTRUCTURE
MIL truly understands that our growth ambitions and dynamic customer requirements cannot be met without maximum self-sufficiency.
Made-ups Unit
Madhu Industries Pvt. Ltd. has recently established a state of the art Fabric Finishing Unit spread over 120,000 sq ft floor area. This three story, Ultramodern, Eco-friendly building was built in order to provide better working conditions for its work force. Some of its features include
- Better Lighting Usage of large recessed windows to allow natural light into the building and at the same time avoid heat.
- Passive Cooling The building uses PDEC (Passive Downdraft Evaporative Cooling) together with solar pumps for effective ventilation bringing in natural air and avoiding air conditioning of the interiors.
- Better Materials The building uses fly ash bricks for load bearing walls and hollow blocks in the slab effective use of industrial wastes like fly ash and recycled polystyrene.
- Better Construction/Engineering Practices Use of hollow block slab, load bearing periphery walls with reinforced columns inside and no lintels make good engineering effectively reduce the time and resources required for the building, with better quality.
This newly constructed building has augmented our production capacity to 25,000 bed sets per day.